Transition Zones

Explore

See how a block could change.

Start with the Danforth demonstration, then compare the broader approaches and explore built Toronto examples.

A worked Toronto example

A block can change.
One project at a time.

Explore Danforth between Chester and Arundel. Start with the proposal, compare it with the earlier stages, and switch views to explore the buildings, lane and shared spaces.

Danforth block: Further change, spatial viewSchematic Toronto fabric with deeper attached commercial buildings on Danforth, houses with rear additions, private yards, garages and rear suites beside a central lane. The new buildings in the later scenario show separate eight- and six-storey Danforth projects spanning several properties, with upper floors stepped back above a four-storey streetwall and existing shops retained between and beside them. Smaller footprints and setbacks give the four- to six-storey projects behind them room for yards and shared spaces. Wider two- and three-storey mixed-use rear buildings face the lane close to Danforth, with courtyards separating them from the main buildings. New three-storey neighbourhood forms and smaller one- and two-storey rear buildings sit further north. Retained buildings and house conversions keep their baseline heights. Shared spaces and curbside functions are illustrative proposals. Chester west, Arundel east, Danforth south, parking and subway corridor retained. Terracotta marks new or adapted buildings. Dashed edges mark potential greenways, subject to secured access and design. Illustrative buildings and heights; not a current inventory or development permission.DANFORTH / CHESTER–ARUNDEL12345TChesterArundelDanforth AvenueNeighbourhood continues northRear laneNStepped upper floors, smaller footprints and mixed-use rear buildings.Illustrative buildings and heights; not a current inventory or development permission.
Retained / contextNew or adaptedLandscape / connectionsHousing over a local use

The views use the same model. Inner roof outlines mark inset upper floors. Enlarge the drawing for a closer look.

04 / Further change

Let a wider transition emerge over time.

Two mid-rise projects on Danforth combine several properties: a larger eight-storey building and a smaller six-storey building. Both step back above the fourth storey, with existing shops retained between and beside them. Lower coverage and clearer setbacks make room around the four- and six-storey buildings behind them, followed by new three-storey homes further north.

What needs to work

Retain useful buildings, provide daylight and usable outdoor space, and coordinate access and servicing. Plan the stewardship and operating arrangements for shared spaces alongside the new permissions.

An illustration, not a development proposal. The lot pattern and building fabric are informed by a City aerial reference from 2017. Houses, additions, garages and rear suites are illustrative, not a current inventory. The sequence tests an approach; it does not establish permissions or assign projects to owners. Parking, the subway corridor and rear lane remain.

A proposed height pattern. The height transition applies to the new buildings: six to eight storeys on Danforth, with upper floors stepped back above the fourth storey; four to six behind it, with space around each building; and three-storey forms further into the neighbourhood. Two- and three-storey mixed-use rear buildings span more of the rear frontage close to Danforth, with separation from the main buildings. Smaller one- and two-storey rear buildings remain further into the neighbourhood. Existing houses, shops and conversions retain their baseline heights. These illustrative heights do not establish current site permissions.

01

Apartments behind Danforth

Four- and six-storey buildings bridge the main street and the lower-scale neighbourhood. Smaller footprints, setbacks and an inset upper portion on the taller example leave room for yards, access and shared space.

02

Homes and rear suites

New three-storey attached homes sit among existing houses. Other projects could convert a building or add a smaller rear suite without increasing the house’s height. Closer to Danforth, wider two- and three-storey rear buildings could combine housing with local uses. Courtyards, access and the relationship between buildings would shape their design.

03

Neighbourhood uses

The three-storey infill on Arundel combines housing with a ground-floor shop or service. The rear buildings illustrate housing above a tool library, workspace or small lane-facing business.

04

Shared places

Small, defined areas illustrate a community garden, a shared outdoor amenity court and privately owned publicly accessible space (POPS). These depend on landowner agreements, access and stewardship.

05

Services at the block scale

Bicycle parking, a shared loading bay (L), on-street resident and visitor parking, and a separate drop-off or lay-by area (D) could serve several buildings. Test street space, walking and cycling, access, turning and operating arrangements together.

Interpretive diagrams by Transition Zones, using the street and transit relationships in the City’s 2022 SASP 772, Maps 2 and 3A, and Danforth Urban Design Guidelines. The central lane and fuller lot pattern are informed by the City’s 2017 Chester station aerial (Appendix A). Greenway edges would be on private lands alongside the corridor, subject to design, access and maintenance arrangements. The section uses different horizontal and vertical scales.

A simpler comparison

Why extend change
beyond the main street?

Compare a corridor-only approach with selected changes on adjoining properties. Existing buildings remain between projects in either case.

Long-term transition: an eight-storey main-street project, a six-storey apartment on the first adjoining site, then four- and three-storey projects with retained homes farther into the neighbourhoodMAIN STREETADJOINING PROPERTIESNEIGHBOURHOOD8 storeys4–6 storeys4 storeys3 storeysRetainedRetainedCorridor projectNew apartmentFurther transitionRetained buildingsA simple comparison of approaches. Heights and spacing are illustrative.

Plan the longer-term transition.

The first adjoining site can accommodate a four- to six-storey apartment, with smaller new projects farther into the neighbourhood. Other buildings remain.

Within one property

From the street to the lane.

A four- to six-storey principal building can sit in front of a two- to three-storey mixed-use rear building, separated by a courtyard. This section shows the site depth that the street elevation cannot reveal.

Illustrative proposed forms. Dimensions, access and building design require testing.

Illustrative section through one transition-area property: a four- to six-storey principal building facing the street, a courtyard, and a two- to three-storey mixed-use rear building facing the lanePrincipal buildingRear building4–6 storeysCourtyard2–3 storeysStreetLane

On a small screen, scroll within the upper diagram to see the whole comparison.

Main-street projectNeighbourhood projectsRetained buildings

One policy application / Toronto

Station proximity
changes the permissions.

In approved station areas, the 2025 provincial modifications permit multiplexes and apartments on Neighbourhood-designated lands at scales linked to station proximity and major-street frontage.

Schematic of Official Plan permissions on Neighbourhood-designated lands in approved station areas: apartments up to six storeys within 200 metres or on major streets; multiplexes and apartments up to four storeys throughout the delineated station areaT200 mMajor streetDelineated station-area boundaryNEIGHBOURHOOD-DESIGNATED LANDSApartment buildingsUp to 6 storeysWithin 200 m of a station, orwith frontage on a Map 3 major street.Multiplexes and apartment buildingsUp to 4 storeysThroughout the delineated station area.Official Plan permissions · Chapter 8, policy 8Schematic only. Actual station-area boundaries, land use designations and other applicable policies govern.

The six-storey category also applies to sites fronting a Map 3 major street within the approved station area. The four-storey category is not a universal cap where other applicable policies permit more. Policy permissions and implementing zoning must be read separately.

Read Chapter 8, Neighbourhoods policy 8

Built references / Toronto

Parts of the idea,
already built.

These eight places illustrate housing at different scales, shared gardens and neighbourhood uses. Their photographs appear beside the relevant discussions throughout the site.

Each has its own site and approval history. They are design references; the policy case studies address area-wide planning, and the renderings picture possible change.

Built exampleWhat it contributesFind the photograph
Bain Apartments Co-opShared gardens and pedestrian pathsImplementation
35 WabashNew housing within an established neighbourhoodThe concept
383 SoraurenHousing at the edge of industrial and residential fabricThe concept
Motif Lofts and TownsAttached housing behind a mixed-use frontageImplementation
The SouthwoodApartments, townhouses and shopsThe case
Montrose housingStreet-facing and laneway housing togetherImplementation
Oben Flats LeslievilleRental housing above main-street retailThe case
Boxcar Social LanewayA neighbourhood business in a rear-lane settingImplementation
Picture the wider transition
Next / Policy historyWhere this logic appears in Toronto